Articles:
Hydrogen: Blending Toward a CO2 Emission-Free Future
by David S. Neff, P.E, Power Flame Director of Engineering and R&D
Today’s boilers are experiencing continuing pollution control limits in the form of emissions reduction legislation. While the public, media, and policy environment often think of pollution controls as a signal problem, most engineers understand emissions are a chain of complex problems. Read more:
Are you in Control?
by Lee Duncan, Power Flame Senior Sales Manager
Fully integrated control systems offer a centralized data collection & control hub for the boiler room. From monitoring the flame signal to controlling the level in the deaerator, these boiler/burner-specific program-able logic controllers offer flexibility in the operation of a boiler room. Read more:
Specifying Burners and Controls for Process Heating
by Jason Howard, Power Flame Director of Sales & Marketing
The spectrum of applications found in the process industries means that burner designs must vary widely. Smaller burners are utilized in paint booths, ovens, and furnaces while larger burners are specified for incinerators, thermal oil heaters and oxidizers. When deciding on a process heating burner, it is important to take into consideration several criteria. Read more:
Events:
LOCATION: ORLANDO, FL
DATE: FEBRUARY 10–12, 2025
BOOTH NUMBER: 1843
CRAFT BREWERS CONF.
LOCATION: INDIANAPOLIS, IN
DATE: APRIL 28-MAY 1, 2025
LOCATION: NASHVILLE, TN
DATE: MARCH 31, 2025
BOOTH NUMBER: 602
News & stories
January 24, 2025
We are deeply saddened that on Friday, January 24, 2025, a Power Flame Inc., an Astec Industries company, employee was found unresponsive at our Parsons, Kansas facility and was confirmed deceased by local emergency responders. We have extended our heartfelt condolences to the individual’s family and are engaged with them during this challenging time. The safety and wellbeing of our team members is of the utmost importance, and we are conducting a thorough assessment. We are also working in full compliance and cooperation with the authorities.
Last day of our Parallel Positioning Training focuses on #autoflame Mk8. Thank you to the Autoflame Team for partnering with us on this training.
Learn more about the Power Flame Training School: bit.ly/Power_Flame_Training
Next Parallel Positioning Training is scheduled for October 7-9.
#PowerFlame #burners #Boilers #controlsystems #OneAstec ... See MoreSee Less
During the second day of our Parallel Positioning Training, we are focusing on Siemens LMV5 and LMV3 controls. Thank you to Aaron Zoeller with #Siemens Controls for teaching this section of the class.
Learn more about the Power Flame Training School: bit.ly/Power_Flame_Training
Next Parallel Positioning Training is scheduled for October 7-9.
#PowerFlame #burners #Boilers #controlsystems #OneAstec ... See MoreSee Less
Our Parallel Positioning Training is in session. First day of the class focuses on #Fireye NXF4000 burner control. Thank you to the Fireye team for partnering with us on this training.
Learn more about the Power Flame Training School: bit.ly/Power_Flame_Training
Next Parallel Positioning Training is scheduled for October 7-9.
#PowerFlame #factorytrained #burners #Boilers #controlsystems #OneAstec ... See MoreSee Less
As we celebrate #EarthDay, join us in the journey toward a cleaner, greener, and more sustainable future. Discover how #PowerFlame can help you make a difference and leave a lasting legacy for generations to come.
Let’s make a positive change today for a better tomorrow.
#burner #boiler #processheating #OneASTEC #LowNOx ... See MoreSee Less
#happyeaster from your friends at #PowerFlame. Enjoy your weekend. ... See MoreSee Less
Customer Testimonial - Power Flame Training School
Lonnie Tomie from Commercial Service of Bloomington shares his thoughts on the Fundamentals of Combustion, 101 and Cmax Burner #training, 201.
Lonnie, thank you for your kind words. We are looking forward to seeing you in future #PowerFlame training classes.
To view our upcoming class schedule visit: bit.ly/Power_Flame_Training
#factorytrained #burners #Boilers #controlsystems #OneAstec ... See MoreSee Less
Converting your existing flow control valve to Power Flame's K7 Flow Control Valve is a simple task.
The K7 valve offers improved flow accuracy thanks to a single piece final assembly which overcomes hysteresis. The valve also has the ability to operate in both a Clock Wise (CW) or Counter Clock Wise (CCW) direction allowing it to be bidirectional.
The K7 valve will operate for #2 fuel oil, B20, and liquid propane. The K7 Valve comes in two body sizes 3” and 4” in diameter. There are multiple sizes within each body size. K7-3-X valve will handle up to 900 BHP.
Valve conversion kits are available. Learn more: bit.ly/K7_FlowControlValve
Contact your local Power Flame Representative for sizing assistance and pricing.
#PowerFlame #burners #Boilers #controlsystems #k7valve #OneAstec ... See MoreSee Less
Last call for our Parallel Positioning Training starting on April 29th. This three-day hands-on class covers several mainstream parallel positioning platforms, including #Siemens LMV5, #Fireye Nexus, and #autoflame Mk8. Register here: bit.ly/Power_Flame_Training
#PowerFlame #factorytrained #burners #Boilers #controlsystems #parallelpositioning #OneAstec ... See MoreSee Less
The Power Flame JA gas burner presents optimum, state-of-the-art design for maximum combustion efficiency and operating dependability.
JA Burner Features:
- Fuel: gaseous fuels
- 300,000-2,200,000 BTU/HR
- JA HTD option available
- High performance forced draft power gas burner
- Capable of firing high pressure drop and confined combustion chamber configurations
All #PowerFlame packaged #combustion systems are factory fire-tested to ensure customer satisfaction and cost effective installation and start up.
#burners #Boilers #controlsystems #OneAstec ... See MoreSee Less